What states changed on data centers in 2026
Five states, four venues: legislatures, governors, utility regulators, and local governments. Each state moved, and each moved through a different door.
Current as of November 19, 2026. Covers Pennsylvania, Virginia, Ohio, Maryland, and Georgia, the same five states as the data center incentive comparison.
The first comparison looked at what these states give data centers. The second looked at whether states check what they give. This one looks at what changed in 2026, and which part of government produced each change.
Where each state acted
| State | Legislature | Governor | Utility regulator | Local government |
|---|---|---|---|---|
| Pennsylvania | Reporting enacted; repeal stalledHouse voted 197–5 to repeal the sales tax exemption and passed a PUC cost-allocation bill (HB 1834). The Senate passed repeal language in a separate bill, HB 1667 (44–6), but the two were never reconciled. HB 1834 was referred to Senate Consumer Protection & Professional Licensure on March 31, 2026; it did not receive a final vote before the session’s last voting day, Nov. 17, 2026 (as reported) and would need to be reintroduced in the 2027–28 session. The FY 2026–27 Fiscal Code (SB 146, Act 21 of 2026) expanded PUC review of utility load forecasts and added annual energy and water reporting for data centers of 10 MW or more. Nov. 3, 2026 election: the same party now holds the governor's office and both legislative chambers, with a 26–24 Senate majority (as reported) and 111 of 203 House seats in unofficial results, four House races uncalled (as reported). Incoming Senate leadership cited guardrails on data centers among its 2027 priorities (as reported). | Executive order, Aug. 18EO 2026-05 ties new exemption applications to the GRID Requirements. The GRID Requirements, released May 27, 2026, require new capacity physically deliverable to the PJM deliverability area where the data center is located, with a rising share from dispatchable clean firm resources in Pennsylvania (such as nuclear, hydropower, geothermal, or fossil generation with carbon capture), starting at 10% and reaching 32% by 2035. Developers pay the full cost of that capacity and of the interconnection, transmission, distribution and network upgrades their demand causes. DEP reviews data center permit applications only with a legally binding commitment to the GRID Requirements, made through a Consent Order and Agreement for projects above 25 MW peak demand, and will not issue permits until local land use approvals are secured. As of Nov. 10, 2026, DEP said about 25 data center projects were in some stage of permitting and none had signed a consent order; DEP said it was negotiating with a number of developers (as reported). Developers who decline face a delayed track: DEP will not begin review until all local approvals are in place. The order also ends data center projects' eligibility for the PA Permit Fast Track Program (Section 1(e)) and directs DEP to find ways to speed permitting for energy and storage projects on brownfield sites and to remove barriers to advanced reconductoring on existing transmission rights-of-way (Section 4(b)). Also bars agency NDAs and requires a public map of proposed projects. On Oct. 15, 2026, the Governor petitioned to intervene in the PUC proceeding on the Office of Consumer Advocate's complaint against PPL Electric Utilities' rates (Docket C-2026-3065756), seeking a separate rate class for large data centers, stronger requirements for data center transmission upgrades, cost treatment for regional reliability programs, and safeguards for existing customers if supply cannot meet demand. The Governor's office called it the first such intervention by a governor in at least 15 years. | Model tariff adopted, May 12PUC final order sets a statewide framework for customers over 50 MW (or 100 MW in aggregate); each utility adopts it through its own approved tariff. | No final actionThree bills did not receive final votes before the session’s last voting day, Nov. 17, 2026 (as reported), and would need to be reintroduced in the 2027–28 session. HB 2496 would let municipalities pause new data center applications for up to 180 days; it passed the House 201–1 and Senate Local Government 11–0. SB 1345 would let municipalities adopt a moratorium of up to 18 months on new applications for high impact data centers; it cleared Senate Local Government 10–1 and Senate Rules & Executive Nominations 13–4. HB 2496 was re-referred to Senate Rules & Executive Nominations on June 30, 2026, and SB 1345 remained in that committee. SB 1359 would impose a three-year statewide moratorium on hyperscale data centers; it was referred to Senate Local Government on June 4 and remained there; on June 30, Sen. Rosemary Brown offered its statewide moratorium as an amendment to SB 1345 in that committee, and the amendment failed 9–2 (as reported). None had a full Senate vote. In Commonwealth Court, Muncy Township (Lycoming County) supervisors, residents and Green Amendments for the Generations are challenging the Municipalities Planning Code's deemed-approval provisions under the state constitution's Environmental Rights Amendment, after a data center developer said its application was deemed approved when no hearing was held within 60 days. No ruling has been reported (as reported). Archbald Borough Council denied the Wildcat Ridge conditional use application 7–0 on Oct. 21, 2026, after nine hearings; an appeal is expected (as reported). |
| Virginia | EnactedAbout 15 bills plus the budget: a $0.011/kWh consumption tax, 25 MW cost allocation, siting disclosure, generator and water rules. Exemption preserved. HB 434 / SB 621 (Chapters 611 and 612) required Dominion Energy Virginia and Appalachian Power to petition the SCC by Oct. 15, 2026 for approval of grid utilization metrics. | Executive order, Sept. 18Data Center Accountability Framework and EO 22. | First report published Oct. 1SCC's first annual report reported about 21,800 MW of contracted data center demand and 13,767 permitted backup generator sets, about three-quarters of them Tier 2 or older. Water data is pending. The SCC is also reviewing NextEra's proposed acquisition of Dominion Energy, which would carry a 130 GW large-load pipeline. SCC staff testified Oct. 19 that the merger as proposed should be denied, but would not oppose approval with conditions, including an independent Dominion Energy Virginia board and dividend limits. Gov. Spanberger asked the SCC for a six-year residential base-rate freeze, bill credits and commitments that data centers pay for their own energy needs, or else denial (as reported). The evidentiary hearing begins Nov. 17; a decision is expected in January 2027. | New state rules for local votesDevelopers of the largest facilities must disclose more before a local board votes. |
| Ohio | No final action; study committeeNo data center bill enacted. Substitute HB 646 stalled in June and is expected to return after the November election. Repeal bills HB 975 and SB 374 are in committee without hearings. Joint Data Center Committee studying. | Directive, May 27Pause on new sales tax exemption requests at the Tax Credit Authority. | Approved 2025; under appealAEP Ohio tariff: new data centers pay for at least 85% of requested load. | Statewide proposalA citizen group has proposed a constitutional amendment to ban very large AI data centers. |
| Maryland | EnactedUtility RELIEF Act of 2026: large load definition, cost allocation, reporting. Exemption repeal planned for 2027. | Executive order, Sept. 23Single review for 25 MW and up, state task force, public dashboard, no agency NDAs. | PendingLarge load tariff proceeding for BGE, Pepco, and Delmarva before the PSC. | Moratoriums and bans14 of 24 jurisdictions, including Harford County's indefinite ban. |
| Georgia | No final actionSenate passed exemption repeal; House passed HB 1063 159–5. Neither became law. | None identifiedNo 2026 executive action found. | Rules in effectCustom contracts for 100 MW and up; about 10,000 MW of new generation approved; base rates frozen through 2028. | County moratoriumsNumerous counties, including Cobb, Dougherty, Cherokee, and Fannin, paused data centers while they write zoning rules. In the Nov. 3 PSC elections, Peter Hubbard was re-elected in District 3 and Shelia Edwards was elected in District 5 (unofficial results) (as reported). In the Nov. 3 governor's race, Keisha Lance Bottoms was elected (as reported). |
By issue
| Issue | Pennsylvania | Virginia | Ohio | Maryland | Georgia |
|---|---|---|---|---|---|
| Sales tax exemption | Still in effect. House passed repeal 197–5 on June 25; the Senate passed repeal language in a separate bill; neither reached the governor. EO 2026-05 makes new applicants meet the GRID Requirements. | Preserved in the 2026–28 budget. Joint Subcommittee on Tax Policy to report on the exemption by mid-December. | Governor paused new exemption requests on May 27 while the Joint Data Center Committee studies growth. Substitute HB 646 would cut new exemptions from 100% to 50% but stalled in June; repeal bills HB 975 and SB 374 have had no hearings. | 2020 exemption remains. Governor will seek repeal in the 2027 session. | Left intact in 2026. Senate passed a repeal bill on March 6; the session ended without final action. |
| New taxes or fees | None enacted. | $0.011 per kWh consumption tax from July 1, 2026, capped at $600 million a year; expires June 30, 2028 unless extended. | None enacted. | None enacted. | None enacted. |
| Who pays for grid costs | PUC’s May 2026 model large-load tariff guides utility-specific tariffs. HB 1834 would go further, assigning connection, transmission, reliability, and PJM emergency procurement costs to data centers; passed House; referred to Senate Consumer Protection & Professional Licensure March 31, 2026. HB 2828, which would require utilities to adopt the PUC’s large-load tariff and data centers to curtail use during grid emergencies, cleared the House Energy Committee unanimously and was laid on the table in the House on Sept. 30, 2026. Neither bill received final votes before the session’s last voting day, Nov. 17, 2026 (as reported); both would need to be reintroduced in the 2027–28 session. | Costs of new generating capacity assigned to customers of 25 MW or more; voluntary demand flexibility programs (HB 284). | AEP Ohio tariff: 85% minimum on requested load, under appeal at the Ohio Supreme Court. Bills would extend the approach statewide. Substitute HB 646, which would create a data center rate class and require a data center tariff at the PUCO, stalled in June. | RELIEF Act assigns infrastructure and grid costs to large load customers. Executive order seeks minimum bills, exit fees, and collateral at the PSC, PJM, and FERC. | PSC requires custom contracts for 100 MW and up and cost studies to protect other customers. HB 1063 passed the House but did not become law. |
| Siting and local approval | DEP reviews data center permit applications only with a legally binding commitment to the GRID Requirements, made through a Consent Order and Agreement for projects above 25 MW peak demand, and will not issue permits until local land use approvals are secured. Developers who decline face a delayed track: DEP will not begin review until all local approvals are in place. Three pause bills did not receive final votes before the session’s last voting day, Nov. 17, 2026 (as reported), and would need to be reintroduced in the 2027–28 session: HB 2496 (up to 180 days, optional for municipalities; passed the House 201–1; re-referred to Senate Rules & Executive Nominations June 30, 2026), SB 1345 (up to 18 months, optional for municipalities; cleared Senate Local Government 10–1 and Senate Rules 13–4; in Senate Rules & Executive Nominations), and SB 1359 (three-year statewide moratorium; in Senate Local Government, though its language failed 9–2 as an amendment to SB 1345 on June 30, as reported). HB 2775, which would require data centers to apply for grid interconnection before seeking local zoning approval, cleared a House committee unanimously the week of Sept. 28 and was laid on the table in the House on Sept. 30, 2026. HB 2674, which would bar data centers from obtaining public utility status, passed the House 202–1 on Oct. 19 and was referred to Senate Consumer Protection & Professional Licensure on Oct. 26, 2026. Neither bill received final votes before the session’s last voting day, Nov. 17, 2026 (as reported); both would need to be reintroduced in the 2027–28 session. | New siting and pre-vote disclosure law for the largest facilities, effective July 1, 2026 (Va. Code § 15.2-2209.5). | Senate bill would address local government impacts. Constitutional amendment proposed. | State agencies defer review until local land use approvals are documented. 14 of 24 jurisdictions have moratoriums or bans. | No statewide siting change identified. Numerous counties adopted moratoriums in 2026 while they write zoning rules, including Cobb, Dougherty, Cherokee, and Fannin. Cobb County noted its 1972 zoning code gives no consideration to data centers. |
| Water | HB 2246, which would create DEP water permitting and reporting, was referred to Senate Environmental Resources & Energy on May 1, 2026; it did not receive a final vote before the session’s last voting day, Nov. 17, 2026 (as reported) and would need to be reintroduced in the 2027–28 session. The FY 2026–27 Fiscal Code (SB 146, Act 21 of 2026) requires data centers of 10 MW or more to report energy and water use annually to DEP, which will publish the data, starting in 2027. EO 2026-05 directs DEP to collect annual energy and water use data from existing facilities. | Water reporting from January 1, 2027; scarcity-area cooling rules due July 1, 2027; budget requires limits on cooling water use. | Senate bill would address water use and testing. | Covered in the executive order's environmental criteria. | No statewide change identified. |
| Transparency | EO 2026-05 bars Commonwealth agencies under the governor from entering NDAs related to data center projects and requires a public map of proposed projects. It does not cover local governments. HB 2359, which would address local NDAs, was referred to Senate Finance on July 10, 2026; it did not receive a final vote before the session’s last voting day, Nov. 17, 2026 (as reported) and would need to be reintroduced in the 2027–28 session. SB 1408, which would ban nondisclosure agreements between data center developers and both state agencies and local governments, cleared the Senate Communications and Technology Committee unanimously, and Senate Rules & Executive Nominations re-reported it as amended 16–0 on Oct. 5, 2026. It did not receive a final vote before the session’s last voting day, Nov. 17, 2026 (as reported), and would need to be reintroduced in the 2027–28 session. | SCC annual report on data center electricity, water, and generators. The first, published October 1, 2026, reported electricity and generator data but no water data; municipal utility responses are pending, and DEQ's public water-use dashboard goes live January 1, 2027. | Senate bill would address nondisclosure agreements. | State agencies may not enter NDAs with data center developers; public dashboard for every project of 25 MW or more. | PSC requires quarterly reporting from Georgia Power. |
What stands out
Governors moved faster than legislatures
Four of the five governors acted outside the legislative process in 2026: executive orders in Pennsylvania, Virginia, and Maryland, and a directive pausing new exemptions in Ohio. Legislatures enacted broad changes in two states, Virginia and Maryland. Pennsylvania's legislature enacted only reporting and load-forecast oversight provisions; both chambers passed exemption repeal language, but in separate bills that were never reconciled. In Georgia, the chambers passed different bills, and neither became law.
The exemptions survived, with strings
No state repealed its data center sales tax exemption in 2026. Instead, states attached conditions or added costs around it: a consumption tax in Virginia, GRID Requirements for new applicants in Pennsylvania, a pause in Ohio, and a repeal effort set for 2027 in Maryland.
Cost allocation is converging on the same tools
Whether by statute, tariff, or executive order, states are reaching for similar mechanisms: size thresholds of 25 or 100 megawatts, minimum bills, long-term contracts, exit fees, and collateral. What differs is who sets them. The durability of each approach will be tested in court in Ohio and at PJM, where Pennsylvania, Virginia, Ohio, and Maryland all sit.
The question I expect to shape 2027: how much of this year's change holds when it rests on executive action rather than statute. An executive order can be revised by the next governor; a law has to be amended by the next legislature.
What to watch
- October 2026: Virginia DEQ's retrofitting study for existing data centers in the Eastern Virginia Groundwater Management Area (due this month; not yet released as of Oct. 16, as reported).
- After November 3, 2026: Ohio's Substitute HB 646, which would cut new data center sales tax exemptions to 50% and create a data center rate class, is expected to return after the November election.
- November 17, 2026: SCC evidentiary hearing on NextEra's proposed acquisition of Dominion Energy.
- Mid-December 2026: Virginia Joint Subcommittee on Tax Policy recommendations on the exemption.
- 2027 session: In Pennsylvania, the same party will hold both chambers and the governorship (as reported). Incoming Senate leadership has listed data center guardrails among its priorities (as reported); no bill text or timing has been announced.
- January 2027: Pennsylvania’s new legislative session begins; 2025–26 data center bills would need to be reintroduced.
- January 2027: Maryland's exemption repeal effort; Virginia's 46 carried-over data center bills; Virginia water reporting takes effect.
- January 2027: SCC decision on the NextEra–Dominion merger expected (as reported).
- January 13, 2027: Virginia's General Assembly convenes with several data center moratorium bills filed. SB 843 (Sens. Russet Perry and Danica Roem) would bar localities, DEQ and the SCC from approving data center permits statewide from July 2027 to July 2030. A separate Roem bill would pause new approvals until data centers already in Dominion's queue are energized. A House bill carried over from 2026 (Del. Irene Shin) would pause local approvals until pending data center service requests are met or July 2028. Sen. Glen Sturtevant plans his own version (as reported).
- Ongoing: Ohio Supreme Court review of the AEP tariff; Maryland PSC large load tariff decision.
- Pending: DCED guidance for local governments on community benefit agreements, directed by Executive Order 2026-05; DCED said in October it hopes to release it ‘soon’ (as reported).
Sources
Pennsylvania
- Office of the Governor, Executive Order 2026-05 announcement (Aug. 18, 2026)
- Office of the Governor, Executive Order 2026-05
- Pennsylvania Capital-Star (June 25, 2026)
- City & State Pennsylvania, HB 1834 (March 24, 2026)
- LegiScan, HB 1834 status
- PennFuture data center legislation tracker
- PA PUC, large load model tariff final order (May 13, 2026)
- Steptoe & Johnson, model tariff and Act 21 of 2026
- PSPE, summary of legislative activity (July 2026)
- Spotlight PA, budget and data center regulations (July 2026)
- PA Environment Digest, HB 2496 House passage (June 2026)
- Pennsylvania General Assembly, HB 2496 status
- Pennsylvania General Assembly, SB 1345 status
- Pennsylvania General Assembly, SB 1359 status
- Pennsylvania General Assembly, SB 1408 status
- FOX56, Brown's push for statewide data center moratorium fails in Senate committee
- Pennsylvania General Assembly, SB 146 status
- Greenberg Traurig, EO 2026-05 requirements (Aug. 2026)
- Morgan Lewis, EO 2026-05 requirements (Aug. 2026)
- Altoona Mirror, data center bills advance (Oct. 2, 2026)
- Pennsylvania House news release, HB 2674 House passage (Oct. 2026)
- DCED, GRID Requirements
- Office of the Governor, full GRID standards release
- Office of the Governor, Oct. 16, 2026
- Pennsylvania Capital-Star, Oct. 5, 2026
- PennLive, DCED community benefit agreement guidance status (Oct. 2026)
- WVIA/Allegheny Front, Archbald conditional use denial (Oct. 2026)
- Spotlight PA, Senate and House election results (Nov. 2026)
- Pennsylvania Capital-Star Morning Guide newsletter (Nov. 5, 2026), Legislative leaders' 2027 priorities including data center guardrails (newsletter text)
- PA Environment Digest, DEP update on data center permitting (Nov. 10, 2026)
- The Center Square (Nov. 17, 2026), Pennsylvania General Assembly session’s final scheduled voting day
Virginia
- Whiteford, consumption tax and budget
- ARLnow (June 22, 2026)
- MultiState (March 30, 2026)
- National Law Review, environmental update
- Roanoke Rambler, siting law
- Office of the Governor, Data Center Accountability Framework (Sept. 18, 2026)
- Virginia State Corporation Commission, Report on Information Concerning Data Centers (Oct. 1, 2026)
- Hunton, 2026 Virginia environmental legislative update for data centers
- Virginia State Corporation Commission, Dominion-NextEra merger updates
- Utility Dive, Combined NextEra-Dominion would have 130-GW large-load pipeline (May 18, 2026)
- WTKR, Spanberger filing and SCC staff testimony (Oct. 2026)
- Virginia Mercury, data center moratorium bills ahead of the 2027 session (Oct. 16, 2026)
- Virginia General Assembly, Chapter 612
- Latitude Media, the first grid utilization metrics
Ohio
- Office of the Governor, exemption pause (May 27, 2026)
- WOSU, AEP tariff and House bill (March 2026)
- Ohio Capital Journal, Senate bill (June 10, 2026)
- Ohio Capital Journal, Substitute HB 646 stalls (June 11, 2026)
- OSU Extension Lorain County, state of data center legislation (July 8, 2026)
Maryland
- Office of the Governor, executive order (Sept. 23, 2026)
- Maryland Matters (Sept. 23, 2026)
- The Daily Record, RELIEF Act context
- Maryland Bay News, local moratoriums
- Daily Energy Insider, PSC tariff proceeding
Georgia
- Georgia Watch (April 7, 2026)
- Compute Law Blog, PSC rules
- Georgia PSC data center fact sheet (March 2026)
- 2026 Georgia PSC election
- Rough Draft Atlanta, PSC election results (Nov. 4, 2026)
- Latitude Media, Nov. 3, 2026 election results (Nov. 2026)
- 11Alive, Cobb County moratorium extended (Aug. 2026)
- WALB, Dougherty County moratorium extended (Aug. 31, 2026)